Check space above and below ground
Mark the tank footprint and the route for its inlets and outlet. Check the available depth against the levels on the stormwater plan.
If vehicles will pass above the tank, tell your engineer what vehicles can use the area. Check the tank structure and the access cover separately.
Plan the installation with your contractor
- Check the access route for delivery and lifting equipment.
- Share information about ground conditions, groundwater and nearby services.
- Confirm the excavation, bedding and backfill requirements for the selected tank.
- Keep inspection and maintenance points accessible after paving or landscaping.
What to send for a quote
Send the site plan, tank section and storage requirement. Include the cover depth and any load requirements that your engineer specifies.
Tell us which parts your contractor plans to supply. We can use that information to clarify the scope of the quote.
