Stormwater supply for professionals

Request a quote for detention tanks, modular systems, pits and outlet parts. Send the details for one site or for several stages.

A project team reviews plans beside a concrete stormwater detention tank
Illustration of a detention tank site.

For your project team

Builders and site supervisors

Send the current drainage plan and excavation date. Include delivery vehicle limits and the person who will unload the equipment.

Explore underground tanks

Developers and project managers

Group the quantities by site, lot or stage. Send the delivery dates for each stage.

Compare detention systems

Civil and hydraulic engineers

Send the specified detention volume, pipe levels and load requirements. List the drawings and product data that you need to review.

View technical resources

Plumbers and drainage contractors

Send a pit schedule or a plan that shows the pits. Include pipe sizes, connection levels and the specified grates or covers.

Explore stormwater pits

Illustrations of work on stormwater projects.

What to send for a trade quote

  • Include the site postcode, target delivery date and current plan revision.
  • Attach the stormwater plan and the tank or pit schedule.
  • List the quantities and any product references on the plan.
  • Tell us the site access limits and where your team can unload.
  • List the parts your team will supply and the documents you need from us.

Check the quote against the plan

Use the same plan revision and list of items when you compare quotes. Check which pits, covers and outlet parts each quote includes.

Ask your project engineer to check the proposed products against the design before you order.

Plan orders by site or stage

Send one schedule with a line for each site or stage. Include the site postcode, delivery week and quantities.

Tell us which items may change when the next plan revision is ready.